01
CANNOCK
On behalf of a national logistics company, Flexispace carried out some works to Cannock which mainly consisted of roof works. These included removal of vegetation, replacement of tubular lighting, supplying and fitting ceiling tiles, to mention a few.




02
MAIDSTONE
Over 2018 and 2019 we had a 12 month contract whereby constant presence on site was required at Maidstone. Carrying out refurbishments on WC's & locker rooms, canteen creating a "chill zone" upgrading lighting and carrying out electrical testing, emergency repairs and maintenance to loading bays, as well as decorating offices.




03
LUTTERWORTH
The first stage is to take the tracking system down
Flexispace were awarded the contract for Large Mez, Small Mez, Enviro Office and Dexion Racking Removal.
Large Mez:
Electrical ,data, fire alarm, access/cctv and mechanical strip out, strip and remove mez, flooring and make good of bolts.
Small Mez
Electrical ,data, fire alarm, access/cctv and mechanical strip out, strip and remove mez, flooring and make good of bolts, drain down and cap-off redundant sprinkler pipework
Enviro Office
-
Removal of sprinkler system
-
Removal of data, CCTV and fire alarm installations
-
Removal of input/extract fans and associated ductwork and grills
-
Patch up external cladding
-
Removal of the partitions, ceilings and floor coverings
Dexion Racking Removal
-
Dismantle all parts by hand and palletise
04
CAMBERLEY
Flexispace were awarded the contract for the fit out works at Unit 4, Watchmoor Point, Camberley.
Works compromised of constructing new offices, the supply and fit of new LED lighting, complete redecoration works and the supply and fit of new flooring. A new customer collection hatch constructed by our team of contractors was installed with them also installing Armco barriers throughout the site. A high value security cage was built complete with access mesh doors. Roller shutter doors were also installed by one of our trusted contractors and new POD Points were installed allowing vehicle charging to take place on site.




05
NOTTINGHAM
Our drone video shows the works
approaching completion on DHL Langley Mill
Decapitation works are being done on the Ferrero Rocher former site.
These works included:
- New roof lights.
- Full building clean.
- New Gutters.
- Cladding repairs.
- Refurbishment of offices.
- Removal of rneking.
- Yard repairs.
06
JOHN LENNON AIRPORT, LIVERPOOL
Completed in January 2024 were adaptation works to the airport's new Recreation Room.
The site underwent initial strip-out works and was supplied and fitted with the following:
-
New non-slip flooring.
-
New skirtings.
-
New ceiling grid and tiles.
-
New electrical sockets.
-
A new sink base unit, sink, tap, waste, and under-sink hot-water heater exists.
-
New over-sink hot water tap.
-
Full redecoration works.

07
SPITFIRE ROAD
At Spitfire Road a complete overhaul to the roof, dock levellers, bay doors and bumpers plus extensive external redecoration work took place.
Warehouse and external lighting has been replaced with LED and the out of service passenger lift refurbished.